Strata Networks

Strata Networks is a data center in Vernal, UT, US. The facility is currently operational. It sits in the Bluffdale data-center market on the WECC grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 16.3-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.

Status
Operational
Market
Vernal
State
UT
Country
US

Market intelligence

CAUTION

Data Center Power Index verdict for Bluffdale — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Bluffdale — the market this facility sits in (full deep-dive →).

Bluffdale remains an underdeveloped market with zero operational megawatts across 13 tracked facilities, signaling either early-stage infrastructure build or stalled project deployment. The market's power positioning scores reveal structural tension: an excess-power DCPI rating of 53/100 suggests available grid capacity, but a constraint score of 40/100 indicates real bottlenecks in transmission or interconnection infrastructure. This disconnect—adequate generation paired with distribution friction—creates a cautionary profile for capital deployment. The facility count of 13 with zero MW suggests most tracked sites are either pre-operational, under construction, or in early permitting phases rather than revenue-generating assets. The CAUTION verdict warrants disciplined rather than dismissive positioning. Markets with balanced or slightly elevated constraint scores 40/100 typically face…

Location

Area Vernal, UT, US

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

MarketBluffdale
Grid operatorWECC
Data Center Power IndexCAUTION
Est. time to power16.3 months
LocationVernal, US
Nearest substationwithin 1 km

Fiber connectivity

Networks recorded as present at or immediately around Strata Networks in public peering records. Treat this as a map of who is there, not as a list of contracted cross-connects — availability, diversity and pricing are the operator’s to confirm.

STRATA Networks

Source: PeeringDB carrier-to-facility records, matched to this site by location. A network listed here may sit in a neighbouring hall or an adjacent building at the same address, so presence is reported for the location rather than for a single suite.

Power generation nearby

DC Hub tracks 2 operating generating units totalling 512 MW within about 50 km of Vernal, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Coal500 MW · 1 unit · 98%
Utility-Scale Solar12 MW · 1 unit · 2%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Vernal tracked by DC Hub — compare power, operators, and grid context across the market.

Get the full global facility map + power scores & site-selection tools — DC Hub from $49 → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="strata-networks-strata-networks-a093d8d3" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind