Pawsey Supercomputing Centre is a data center operated by Unknown. It sits in the Perth data-center market on the AEMO grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 32.7-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Changes DC Hub has recorded to this facility’s record, newest first.
Data Center Power Index verdict for Perth — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Perth — the market this facility sits in (full deep-dive →).
Perth's data center market remains constrained and undersupplied, with 75 tracked facilities totaling 260 MW across a fragmented operator base. The excess-power score of 35/100 signals acute capacity scarcity, while the constraint rating of 52/100 reflects infrastructure bottlenecks that limit expansion velocity. This combination positions Perth as a low-utilization, high-friction market where supply cannot meet near-term demand growth. The DCPI verdict of AVOID is unambiguous for acquisition-stage investors: the market lacks the operational surplus and pricing flexibility that make M&A economically defensible. With only 35 points of excess power available, any inbound capital would compete directly with existing operators for scarce grid capacity and interconnect slots. Buyers entering now would inherit legacy asset bases constrained by the same infrastructure limitations that suppress…
Published DC Hub data for this location.
DC Hub tracks 23 operating generating units totalling 1,720 MW within about 50 km of this location. Generation mix shapes both carbon profile and interconnection options for a site at this location.
Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.
get_facility slug="unknown-pawsey-supercomputing-centre-c264b5a5" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect