OSM DC 186515922 is a data center operated by Unknown in US. The facility is currently operational. It sits in the Lenoir data-center market on the SERC grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 11.4-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Changes DC Hub has recorded to this facility’s record, newest first.
Data Center Power Index verdict for Lenoir — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Lenoir — the market this facility sits in (full deep-dive →).
Lenoir's data center market remains nascent and severely constrained. The region hosts four tracked facilities delivering 200 MW of aggregate capacity, concentrated among Google operating two sites, Centrilogic, and Dacentec. The DCPI framework assigns this market an excess-power score of 38/100 and constraint rating of 27/100—both in the lower quartile—reflecting acute infrastructure friction across the market. The dual-constraint verdict demands caution from both buyers and operators. An excess-power score of 38/100 signals insufficient available generation or problematic grid access relative to existing and near-term demand; the constraint score of 27/100 indicates severe limitations on physical or logistical expansion capacity. For acquisition-minded investors, this combination means that acquiring operational capacity in Lenoir offers limited upside potential without solving the…
Published DC Hub data for this location.
DC Hub tracks 24 operating generating units totalling 251 MW within about 50 km of US. Generation mix shapes both carbon profile and interconnection options for a site at this location.
Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.
get_facility slug="unknown-osm-dc-186515922-a7926a80" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect