Google Lenoir Data Center

Google

Google Lenoir Data Center is a data center operated by Google in Lenoir, NC, US. It carries a reported power capacity of 200.0 MW and is currently operational. It sits in the Lenoir data-center market on the SERC grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 11.4-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Power
200.0 MW
Status
Operational
Market
Lenoir
State
NC
Country
US
Coordinates
35.9140, -81.5390

Market intelligence

AVOID

Data Center Power Index verdict for Lenoir — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Lenoir — the market this facility sits in (full deep-dive →).

Lenoir's data center footprint remains underdeveloped with only 203 MW across four tracked facilities, placing it among the region's minor markets. Google operates two sites in the market, while Centrilogic and Dacentec each maintain single facilities. The operator concentration around Google reflects the market's limited diversification and suggests constrained investment appetite from mid-tier players over recent years. The DCPI verdict of AVOID reflects a fundamental mismatch between supply and demand dynamics. With an excess-power score of 37/100, Lenoir lacks the available generating capacity or transmission headroom that institutional operators require for multi-phase buildouts. The constraint score of 30/100—while lower than regional peers like Douglasville 58/100 and Washington, DC 65/100—still signals non-trivial friction on land permitting, interconnection timelines, and…

Location

Open in OpenStreetMap →

Market & grid context

Published DC Hub data for this location.

MarketLenoir
Grid operatorSERC
DC Hub Power IndexAVOID
Est. time to power11.4 months
LocationLenoir, US
Reported capacity200.0 MW

Other data centers nearby

Comparable facilities in Lenoir tracked by DC Hub — compare power, operators, and grid context across the market.

Get all 17,000+ facilities + power scores & site-selection tools — DC Hub from $49/mo → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="google-google-lenoir-data-center-d95a5f42" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect?src=page-onramp&entity=google-google-lenoir-data-center-d95a5f42