Unknown OSM DC 1443922527

Last updated

OSM DC 1443922527 is a data center operated by Unknown in Leesburg, VA, US. The facility is currently operational. It sits in the Leesburg data-center market on the PJM grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 35.9-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Status
Operational
Market
Northern Virginia
City
Leesburg
State
VA
Country
US

What changed

Changes DC Hub has recorded to this facility’s record, newest first.

Market intelligence

AVOID

Data Center Power Index verdict for Leesburg — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Leesburg — the market this facility sits in (full deep-dive →).

Leesburg's data center footprint remains modest and operationally constrained. The market comprises 33 tracked facilities totaling 205 MW across a fragmented operator base, with no single dominant player—the largest identified operator controls only 11 facilities. Google and STACK INFRASTRUCTURE each maintain minimal presence 2 and 1 facility respectively, while True North Data Solutions operates 6 sites. This distribution reflects neither consolidation nor institutional dominance, leaving the market structurally exposed to power and grid limitations. The DCPI verdict of excess-power 46/100 paired with constraint 52/100 signals an avoid recommendation grounded in tight margins. The constraint score of 52/100 indicates the region is approaching grid saturation; operators cannot reliably secure additional power allocations without substantial utility coordination or infrastructure…

Location

Area Leesburg, VA, US

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

MarketLeesburg
Grid operatorPJM
Data Center Power IndexAVOID
Est. time to power35.9 months
LocationLeesburg, US
Nearest substationwithin 1 km

Power generation nearby

DC Hub tracks 48 operating generating units totalling 1,582 MW within about 50 km of Leesburg, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas1,138 MW · 3 units · 72%
Utility-Scale Solar224 MW · 40 units · 14%
Bioenergy221 MW · 5 units · 14%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Leesburg tracked by DC Hub — compare power, operators, and grid context across the market.

Get the full global facility map + power scores & site-selection tools — DC Hub from $49 → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="unknown-osm-dc-1443922527-97777ec2" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind