Goldman Sachs is a data center operated by Unknown in Bridgewater Township, NJ, US. The facility is currently operational. It sits in the Bridgewater Township data-center market on the PJM grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 17.2-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Status
Operational
Market
Bridgewater Township
State
NJ
Country
US

What changed

Changes DC Hub has recorded to this facility’s record, newest first.

Market intelligence

AVOID

Data Center Power Index verdict for Bridgewater Township — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Bridgewater Township — the market this facility sits in (full deep-dive →).

Bridgewater Township operates as a nascent, operator-fragmented market with zero operational megawatt capacity across 11 tracked facilities. The DCPI framework assigns the market an excess-power score of 34/100 and constraint score of 33/100—both well below investment-grade thresholds. The operator base is heavily fragmented, with five entities classified as "Unknown," two unidentified operators, and only three named facilities: one operated by 365 Data Centers, one by Goldman Sachs, and one by Verizon Wireless NE Headquarters. Critically, the zero-MW total indicates these are either in pre-operational phases, non-colocation assets, or infrastructure currently offline. The DCPI verdict to AVOID reflects structural insufficiency on both supply and demand axes. An excess-power score of 34/100 signals either inadequate electrical infrastructure, uncertain utility commitments, or limited…

Location

Area Bridgewater Township, NJ, US

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

MarketBridgewater Township
Grid operatorPJM
Data Center Power IndexAVOID
Est. time to power17.2 months
LocationBridgewater Township, US
Nearest substationwithin 5 km

Power generation nearby

DC Hub tracks 263 operating generating units totalling 14,269 MW within about 50 km of Bridgewater Township, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas12,922 MW · 47 units · 91%
Utility-Scale Solar716 MW · 210 units · 5%
Hydropower453 MW · 1 unit · 3%
Bioenergy178 MW · 5 units · 1%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Bridgewater Township tracked by DC Hub — compare power, operators, and grid context across the market.

Get the full global facility map + power scores & site-selection tools — DC Hub from $49 → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="unknown-goldman-sachs-858cecd4" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind