Synergy House Manchester is a data center operated by The UK Grid Network LTD in Manchester, GB. The facility is currently operational. It sits in the Manchester data-center market on the NGESO grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 134.4-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Changes DC Hub has recorded to this facility’s record, newest first.
Data Center Power Index verdict for Manchester — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Manchester — the market this facility sits in (full deep-dive →).
Manchester operates a fragmented 18 MW footprint across 80 facilities, dominated by Equinix's 8-site presence but characterized by thin capacity density and acute grid stress. The market's largest single operator commands less than half the tracked MW, indicating no consolidated platform and high operator fragmentation. Recent activity—including an Equinix-occupied facility changing hands to a new landlord and a proposed edge data center for AI workloads—signals underlying asset churn despite modest scale. The DCPI verdict of AVOID is decisive and unambiguous for acquisition-focused capital. The excess-power score of 20/100 signals severe grid headroom scarcity; paired with a constraint score of 70/100, the market presents a dual penalty structure where both incremental load capacity and existing infrastructure strain limit expansion economics. Operators seeking to deploy additional…
Exact location not on record.
Published DC Hub data for this location.
Comparable facilities in Manchester tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="the-uk-grid-network-ltd-synergy-house-manchester-28c89336" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect