Power availability in Manchester: DCPI verdict AVOID, composite score 12.8 of 100, as of 2026-11-18. Source: DC Hub.
Data Center Market Deep-Dive · 203 words · generated 2026-11-16 from live DC Hub data · DCPI live as of 2026-11-18
Manchester has 18 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-18. By listed capacity the largest operators are Equinix (18 MW).
| Status | MW |
|---|---|
| Operational | 18 |
| Total listed | 18 |
Source: DC Hub (dchub.cloud), facility records as of 2026-11-18. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it can be larger than Total listed.
DC Hub does not hold a lease-rate figure for this market yet.
Only one tracked facility publicly reports megawatt capacity, limiting visibility into total market footprint.
The DCPI verdict flags Manchester as a location to avoid for new power procurement. These readings suggest that new entrants and expansion-stage operators should expect prolonged negotiations with grid operators, capital-intensive infrastructure upgrades, or both, before incremental power can be reliably provisioned to facilities.
Operator fragmentation shapes deal flow dynamics. The Reynolds House acquisition by Volta represents brownfield redeployment rather than greenfield growth, consistent with consolidation patterns seen in peer markets where M&A activity centers on site control rather than capacity multiplication.
| Facility | Operator | Status | MW |
|---|---|---|---|
| Joule House | Equinix | Operational | 18 |
| Equinix MA1 - Manchester, Williams/Kilburn | Equinix | Operational | |
| Equinix MA3 - Manchester, Joule House | Equinix | Operational | |
| Equinix MA4 - Manchester, Synergy House | Equinix | Operational | |
| Synergy House Manchester | The UK Grid Network LTD | Operational | |
| Volta Manchester | Lunar Digital Solutions Limited | Operational | |
| Wavenet Manchester | Wavenet Limited | Operational |
Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.
Browse every data center in United Kingdom.
Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.
Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.
Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).
Manchester: 18 MW tracked, any status — live, cited, and queryable by API or MCP.
JSON: /api/v1/markets/manchester/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-16, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load