Thales

Last updated

Thales is a data center in Doncaster, GB. The facility is currently operational. It sits in the Manchester data-center market on the NGESO grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 134.4-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Status
Operational
City
Doncaster
Country
GB

What changed

Changes DC Hub has recorded to this facility’s record, newest first.

Market intelligence

AVOID

Data Center Power Index verdict for Manchester — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Manchester — the market this facility sits in (full deep-dive →).

Manchester operates a fragmented 18 MW footprint across 80 facilities, dominated by Equinix's 8-site presence but characterized by thin capacity density and acute grid stress. The market's largest single operator commands less than half the tracked MW, indicating no consolidated platform and high operator fragmentation. Recent activity—including an Equinix-occupied facility changing hands to a new landlord and a proposed edge data center for AI workloads—signals underlying asset churn despite modest scale. The DCPI verdict of AVOID is decisive and unambiguous for acquisition-focused capital. The excess-power score of 20/100 signals severe grid headroom scarcity; paired with a constraint score of 70/100, the market presents a dual penalty structure where both incremental load capacity and existing infrastructure strain limit expansion economics. Operators seeking to deploy additional…

Location

Street Wisconsin Drive
Area Doncaster, GB

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

MarketManchester
Grid operatorNGESO
Data Center Power IndexAVOID
Est. time to power134.4 months
LocationDoncaster, GB

Power generation nearby

DC Hub tracks 133 operating generating units totalling 9,435 MW within about 50 km of Doncaster, GB. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas5,530 MW · 18 units · 59%
Bioenergy2,898 MW · 14 units · 31%
Wind509 MW · 37 units · 5%
Utility-Scale Solar497 MW · 64 units · 5%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Get the full global facility map + power scores & site-selection tools — DC Hub from $49 → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="thales-fd892d23" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind