Tallgrass Pecos DC

Tallgrass Energy

Tallgrass Pecos DC is a data center operated by Tallgrass Energy in Pecos, TX, US. It carries a reported power capacity of 200.0 MW and is currently planned. It sits in the West Texas data-center market on the ERCOT grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 56.3-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.

Power
200.0 MW
Status
Planned
Market
Pecos
State
TX
Country
US
Coordinates
31.4200, -103.4900

Market intelligence

CAUTION

Data Center Power Index verdict for West Texas — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on West Texas — the market this facility sits in (full deep-dive →).

West Texas data center infrastructure remains heavily concentrated and undersupplied relative to incoming demand. Nine tracked facilities totaling 3,950 MW are dominated by four unknown operators, with Lancium holding the largest disclosed position at two sites. The region faces acute power constraints DCPI constraint score: 53/100 that offset moderate excess capacity 58/100, creating a structural mismatch between grid headroom and physical space availability. Recent capital flows underscore investor conviction despite these headwinds: Cardinal Data Power secured $20 million in backing for a proposed West Texas campus with scaling targets beyond 5 GW, signaling that institutional capital views current constraints as temporary friction rather than terminal obstacles. The CAUTION verdict demands disciplined selectivity rather than blanket hesitation. Investors pursuing acquisitions in…

Location

Open in OpenStreetMap →

Market & grid context

Published DC Hub data for this location.

MarketWest Texas
Grid operatorERCOT
DC Hub Power IndexCAUTION
Est. time to power56.3 months
LocationPecos, US
Reported capacity200.0 MW

Other data centers nearby

Comparable facilities in Pecos tracked by DC Hub — compare power, operators, and grid context across the market.

Get all 18,000+ facilities + power scores & site-selection tools — DC Hub from $49/mo → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="tallgrass-energy-tallgrass-pecos-dc-bd2c2d56" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect?src=page-onramp&entity=tallgrass-energy-tallgrass-pecos-dc-bd2c2d56