Switch The Citadel

Switch The Citadel is a data center operated by Switch in Reno, NV, US. Its reported power capacity falls in the 100–500 MW range and it is currently operational.

Power
100–500 MW
Status
Operational
City
Reno
State
NV
Country
US

Source: DC Hub facilities registry · Not re-checked · Basis: cited (what this means)

Market intelligence

CAUTION

Reno

Power outlook → Reno market page →

Market context

Switch The Citadel is one of 63 facilities DC Hub’s Reno brief counts on the WECC grid. The closest tracked facility is Novva Tahoe Reno, under 1 km away, and the nearest mapped substation is within 1 km. Read the Reno market brief →

Location

Area Reno, NV, US

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

LocationReno, US
Reported capacity100–500 MW
Nearest substationwithin 1 km

Power generation nearby

DC Hub tracks 29 operating generating units totalling 1,417 MW within about 50 km of Reno, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas1,151 MW · 6 units · 81%
Geothermal172 MW · 12 units · 12%
Utility-Scale Solar94 MW · 11 units · 7%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Nearest first, by distance from this site.

Unlock power scores for this site → MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP over Streamable HTTP at https://dchub.cloud/mcp; call execute_plan with this page's question for one dated, cited answer. You can also query get_facility slug="switch-switch-the-citadel-55bb3f5f". Source: DC Hub (dchub.cloud), as of [the as_of date on the result]. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind