EdgeCore Reno Campus (TRIC)

EdgeCore Reno Campus (TRIC) is a data center operated by EdgeCore Digital Infrastructure in Reno, NV, US. It carries a reported power capacity of 216.0 MW and is currently under construction. It sits in the Reno data-center market on the WECC grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 11.3-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.

Power
216.0 MW
Status
Under Construction
Market
Reno
State
NV
Country
US

Market intelligence

CAUTION

Data Center Power Index verdict for Reno — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Reno — the market this facility sits in (full deep-dive →).

Reno's data center market remains moderately developed but facing power constraints that will shape near-term investment decisions. The tracked market encompasses 64 facilities totaling 1,166 MW across a fragmented operator base. The power availability score of 50/100 indicates adequate but not abundant surplus capacity, while the constraint score of 34/100 signals meaningful limitations on expansion. The "CAUTION" verdict reflects a market in transition—neither oversupplied like Elk Grove nor severely constrained like Washington, DC, but presenting friction points that require operator diligence. For acquisition-focused investors, the CAUTION verdict demands selective entry criteria. The moderate excess-power rating 50/100 means new builds will face more aggressive power-procurement timelines than in markets with higher surplus capacity, but should not face the regulatory or supply…

Location

Area Reno, NV, US

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

MarketReno
Grid operatorWECC
Data Center Power IndexCAUTION
Est. time to power11.3 months
LocationReno, US
Reported capacity216.0 MW
Nearest substationwithin 5 km

Power generation nearby

DC Hub tracks 31 operating generating units totalling 1,421 MW within about 50 km of Reno, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas1,151 MW · 6 units · 81%
Geothermal176 MW · 14 units · 12%
Utility-Scale Solar94 MW · 11 units · 7%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Reno tracked by DC Hub — compare power, operators, and grid context across the market.

Get the full global facility map + power scores & site-selection tools — DC Hub from $49 → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="edgecore-digital-infrastructure-edgecore-reno-campus-tric-83051c40" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind