ServerFarm ATL1 Atlanta is a data center operated by ServerFarm in Suwanee, GA, US. It carries a reported power capacity of 30.0 MW and is currently operational. It sits in the Suwanee data-center market on the SOCO grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 32.2-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Suwanee — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Suwanee — the market this facility sits in (full deep-dive →).
Suwanee's data center footprint remains modest but operationally constrained. The market currently comprises 10 tracked facilities totaling 175 MW, anchored by QTS entities operating four of those sites and Quality Technology Services managing three. The excess-power score of 35/100 signals limited capacity cushion for incremental tenant load, while the constraint rating of 57/100—nearly matching the threshold that triggered AVOID verdicts in peer markets like Douglasville 58/100 and Gainesville—indicates structural headwinds around infrastructure flexibility and expansion potential. The CAUTION verdict reflects a market caught between insufficient spare power and moderate operational friction. For acquisition-focused investors, this positioning is materially weaker than growth-stage markets but not yet prohibitive. The 35/100 excess-power rating means existing facilities are already…
Published DC Hub data for this location.
Comparable facilities in Suwanee tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="serverfarm-serverfarm-atl1-atlanta-3b661cca" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=serverfarm-serverfarm-atl1-atlanta-3b661cca