Power availability in Suwanee, GA: DCPI verdict AVOID, composite score 23.2 of 100, as of 2026-11-18. Source: DC Hub.
Data Center Market Deep-Dive · 272 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-18
Suwanee, GA has 25 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-18. By listed capacity the largest operators are ServerFarm (25 MW).
| Status | MW |
|---|---|
| Operational | 25 |
| Total listed | 25 |
Source: DC Hub (dchub.cloud), facility records as of 2026-11-18. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it can be larger than Total listed.
DC Hub does not hold a lease-rate figure for this market yet.
The verdict is AVOID for parties seeking straightforward grid-based power procurement.
No recent deals have been tracked in Suwanee's market. The absence of announced acquisitions, leases, or expansions in the recent period suggests limited capital movement or operator positioning changes in the tracked dataset. The concentration among three operators and the small facility count (10 sites) mean the market remains relatively inelastic—new entrants would encounter established players with fixed footprints and limited secondary liquidity.
| Facility | Operator | Status | MW |
|---|---|---|---|
| ServerFarm ATL2 Atlanta | ServerFarm | Operational | 25 |
| QTS Atlanta-Suwanee (SUW1) | QTS | Operational | |
| QTS Suwanee | Quality Technology Services | Operational | |
| QTS Suwanee Data Center 1 | QTS Realty | Operational | |
| QTS Suwanee Data Center 2 | Quality Technology Services | Operational | |
| Serverfarm ATL1 Atlanta | Serverfarm | Operational |
Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.
Browse every data center in Georgia.
Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.
Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.
Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).
Suwanee, GA: 105 MW tracked, any status — live, cited, and queryable by API or MCP.
JSON: /api/v1/markets/suwanee/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load