QTS CLT1 CAMPUS is a data center in ROCKHILL, SC. It sits in the Greenville data-center market on the SERC grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 19.5-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Greenville — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Greenville — the market this facility sits in (full deep-dive →).
Greenville's data center footprint remains minimal, with only 4 tracked facilities totaling 10 MW across a fragmented operator base. DC BLOX and DartPoints each operate two sites one directly, one through subsidiary entities, indicating modest consolidation but no dominant regional player. The market lacks the scale typical of tier-one corridors, and recent M&A activity is absent—a telling indicator of limited institutional investor interest in the market. The DCPI verdict of AVOID reflects a market fundamentally constrained by power availability and grid limitations. Excess-power scores of 37/100 signify tight interconnection capacity and limited redundancy for incremental load growth, while the constraint rating of 36/100 flags real infrastructure headwinds. For buyers and operators, this combination means new deployments face non-trivial lead times for power upgrades, interconnection…
Exact location not on record.
Published DC Hub data for this location.
Comparable facilities in ROCKHILL tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="qts-clt1-campus-c458c42a" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect