QTS CLT1 CAMPUS is a data center in ROCKHILL, SC. The facility is currently active. It sits in the Greenville data-center market on the SERC grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 19.5-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Greenville — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Greenville — the market this facility sits in (full deep-dive →).
Greenville's data-center footprint remains nascent, with only 4 tracked facilities totaling 10 MW of capacity dominated by two operator groups: DC BLOX and DartPoints each hold two sites. The market's DCPI score—excess-power at 36/100 and constraint at 40/100—reflects structural underperformance on both the supply and demand sides of the infrastructure equation. With these paired deficits, Greenville sits in a congested middle ground where neither power availability nor utilization pressure justifies capital deployment. The AVOID verdict carries direct implications for acquisition-focused investors. An excess-power score of 36/100 signals that available grid and on-site generation capacity cannot reliably meet incremental demand; a constraint score of 40/100 indicates that transmission and distribution infrastructure poses meaningful friction for expansion. Together, these scores…
Published DC Hub data for this location.
Comparable facilities in ROCKHILL tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="qts-clt1-campus-022afd50" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=qts-clt1-campus-022afd50