Oracle/OpenAI New Mexico is a data center operated by Oracle/OpenAI in NM, US. It carries a reported power capacity of 700.0 MW and is currently planned. It sits in the Los Lunas data-center market on the WECC grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 9.2-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.
Data Center Power Index verdict for Los Lunas — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Los Lunas — the market this facility sits in (full deep-dive →).
Los Lunas remains a nascent market with minimal operational footprint: only 2 tracked facilities representing 0 MW of deployed capacity. Meta is the sole operator with a presence, holding both tracked sites in the region. The market is effectively pre-revenue from an infrastructure deployment standpoint, suggesting either early-stage development or facilities not yet at commercial scale. This absence of measurable capacity underscores the market's immaturity relative to established hubs. The DCPI verdict of CAUTION reflects a mixed risk profile that demands selective entry criteria. The excess-power score of 58/100 indicates adequate regional power availability—positioning Los Lunas favorably against severely constrained markets—but this advantage is substantially tempered by a constraint score of 28/100, which signals meaningful infrastructure friction in grid connectivity,…
Published DC Hub data for this location.
Comparable facilities in NM tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="oracleopenai-oracleopenai-new-mexico-802273f2" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=oracleopenai-oracleopenai-new-mexico-802273f2