Stargate New Mexico Campus

Stargate New Mexico Campus is a data center operated by Stargate (OpenAI/SoftBank/Oracle) in Albuquerque, NM, US. It carries a reported power capacity of 500.0 MW and is currently planned. It sits in the Albuquerque data-center market on the WECC grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 10.7-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.

Power
500.0 MW
Status
Planned
Market
Albuquerque
State
NM
Country
US

Market intelligence

CAUTION

Data Center Power Index verdict for Albuquerque — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Albuquerque — the market this facility sits in (full deep-dive →).

Albuquerque's data center footprint remains modest but constrained, with 35 tracked facilities totaling 500 MW across a fragmented operator base. The market is dominated by unknown operators 4 facilities, followed by municipal and regional players including Albuquerque Public Schools Data Center, CNM Westside Data Center, Bigbyte.cc Albuquerque, and 725. No recent M&A activity has been tracked, indicating limited consolidation pressure or acquisition appetite in the market to date. The DCPI verdict of excess-power 56/100 paired with constraint 32/100 signals caution for prospective investors. The moderate excess-power score suggests adequate available capacity for new deployments, but the constraint reading—while not critical—flags emerging infrastructure limitations that could restrict scaling. This mixed signal indicates the market is neither capacity-starved nor wide open; operators…

Location

Area Albuquerque, NM, US

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

MarketAlbuquerque
Grid operatorWECC
Data Center Power IndexCAUTION
Est. time to power10.7 months
LocationAlbuquerque, US
Reported capacity500.0 MW
Nearest substationwithin 1 km

Fiber connectivity

Networks recorded as present at or immediately around Stargate New Mexico Campus in public peering records. Treat this as a map of who is there, not as a list of contracted cross-connects — availability, diversity and pricing are the operator’s to confirm.

3DS Communications BB3DS Hosting3ds CommunicationsABQIX Route ServersCentersquare-AS12213CityLink Telecommunications NM, LLCCloudflareCogent Communications, Inc.Energy Sciences Network (ESnet)Ezee FiberFONENETFastTrack Communications

Further networks are recorded at this location beyond those listed here.

Source: PeeringDB carrier-to-facility records, matched to this site by location. A network listed here may sit in a neighbouring hall or an adjacent building at the same address, so presence is reported for the location rather than for a single suite.

Power generation nearby

DC Hub tracks 26 operating generating units totalling 1,070 MW within about 50 km of Albuquerque, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Utility-Scale Solar854 MW · 24 units · 80%
Oil/Gas216 MW · 2 units · 20%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Albuquerque tracked by DC Hub — compare power, operators, and grid context across the market.

Get the full global facility map + power scores & site-selection tools — DC Hub from $49 → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="stargate-openaisoftbankoracle-stargate-new-mexico-campus-efe2d3eb" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind