Oracle/OpenAI Abilene, TX

Oracle/OpenAI

Oracle/OpenAI Abilene, TX is a data center operated by Oracle/OpenAI in Abilene, TX, US. It carries a reported power capacity of 600.0 MW and is currently planned. It sits in the Abilene data-center market on the ERCOT grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 59.5-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.

Power
600.0 MW
Status
Planned
City
Abilene
State
TX
Country
US
Coordinates
32.4487, -99.7331
Address
Abilene, TX

Market intelligence

CAUTION

Data Center Power Index verdict for Abilene — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Abilene — the market this facility sits in (full deep-dive →).

Abilene's data center footprint is modest but strategically concentrated, with 10 tracked facilities totaling 5,650 MW dominated by hyperscalers and specialized compute operators. Oracle and OpenAI jointly anchor three facilities, while Oracle independently operates two additional sites, giving the tech giant significant leverage over local capacity. Crusoe Energy, Lancium, and LONGHORN DATA CENTER round out the operator base, reflecting the market's emerging identity as a hub for both mainstream cloud infrastructure and specialized AI/ML workloads. The market has attracted meaningful capital attention—Lancium's $3 billion investment in Abilene signals confidence in the region's long-term viability as a power-efficient compute destination. The DCPI verdict of CAUTION warrants careful interpretation. An excess-power score of 62/100 indicates that Abilene has above-median power…

Location

Open in OpenStreetMap →

Market & grid context

Published DC Hub data for this location.

MarketAbilene
Grid operatorERCOT
DC Hub Power IndexCAUTION
Est. time to power59.5 months
LocationAbilene, US
Reported capacity600.0 MW

Power generation nearby

DC Hub tracks 15 operating generating units totalling 2,878 MW within about 50 km of Abilene, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Wind2,478 MW · 13 units · 86%
Utility-Scale Solar400 MW · 2 units · 14%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Abilene tracked by DC Hub — compare power, operators, and grid context across the market.

Get all 20,100+ facilities + power scores & site-selection tools — DC Hub from $49/mo → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="oracleopenai-oracleopenai-abilene-tx-9e99e976" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect?src=page-onramp&entity=oracleopenai-oracleopenai-abilene-tx-9e99e976
Schema, units and the population behind every count: https://dchub.cloud/bind