Microsoft Mount Pleasant WI Phase 2

Microsoft Mount Pleasant WI Phase 2 is a data center operated by Microsoft in Mount Pleasant, WI, US. It carries a reported power capacity of 300.0 MW and is currently planned.

Power
300.0 MW
Status
Planned
Market
Mount Pleasant
State
WI
Country
US

Source: industry news · As of: · Basis: cited (what this means)

Market intelligence

AVOID

Mount Pleasant

Full DCPI breakdown →

Market context

In the Mount Pleasant market on the MISO grid, Microsoft Mount Pleasant WI Phase 2’s 300 MW is about 7% of the 4,500 MW DC Hub’s brief counts there. The closest tracked facility is Microsoft Mount Pleasant AI Campus, about 1 km away, and the nearest mapped substation is within 5 km. Read the Mount Pleasant market brief →

Location

Area Mount Pleasant, WI, US

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

LocationMount Pleasant, US
Reported capacity300.0 MW
Nearest substationwithin 5 km

Fiber connectivity

Networks recorded as present at or immediately around Microsoft Mount Pleasant WI Phase 2 in public peering records. Treat this as a map of who is there, not as a list of contracted cross-connects — availability, diversity and pricing are the operator’s to confirm.

Microsoft

Source: PeeringDB carrier-to-facility records, matched to this site by location. A network listed here may sit in a neighbouring hall or an adjacent building at the same address, so presence is reported for the location rather than for a single suite.

Power generation nearby

DC Hub tracks 34 operating generating units totalling 3,553 MW within about 50 km of Mount Pleasant, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Coal2,044 MW · 4 units · 58%
Oil/Gas1,249 MW · 9 units · 35%
Utility-Scale Solar257 MW · 19 units · 7%
Wind3 MW · 2 units · 0%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Nearest first, by distance from this site.

Get the full global facility map + power scores & site-selection tools — DC Hub from $49 → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="microsoft-microsoft-mount-pleasant-wi-phase-2-2e632088" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind