Microsoft Mount Pleasant AI Campus

Microsoft Mount Pleasant AI Campus is a data center operated by Microsoft in Mount Pleasant, WI, US. It carries a reported power capacity of 2300.0 MW and is currently under construction. It sits in the Mount Pleasant data-center market on the MISO grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 17.4-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Power
2300.0 MW
Status
Under Construction
Market
Mount Pleasant
State
WI
Country
US

Market intelligence

AVOID

Data Center Power Index verdict for Mount Pleasant — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Mount Pleasant — the market this facility sits in (full deep-dive →).

Mount Pleasant operates 4,500 MW across 9 tracked facilities but faces a critical structural problem: the DCPI rating of 48/100 on excess-power supply paired with 37/100 on constraint signals a market chronically oversupplied relative to actual power demand. Microsoft dominates the operator footprint with 5 facilities, followed by two unknown operators and CMS Internet with one facility each. Recent M&A activity shows two Microsoft transactions, each valued at $5M, though both appear tied to incentive reversals rather than operational expansion—Microsoft waived a $5M development incentive in 2024, with the village subsequently recovering those funds. For acquisition-focused investors, the DCPI verdict is unambiguous: avoid. The excess-power score of 48 indicates the market has already absorbed more generating capacity than near-term colocation demand can justify, making new builds or…

Location

Area Mount Pleasant, WI, US

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

MarketMount Pleasant
Grid operatorMISO
Data Center Power IndexAVOID
Est. time to power17.4 months
LocationMount Pleasant, US
Reported capacity2300.0 MW
Nearest substationwithin 5 km

Fiber connectivity

Networks recorded as present at or immediately around Microsoft Mount Pleasant AI Campus in public peering records. Treat this as a map of who is there, not as a list of contracted cross-connects — availability, diversity and pricing are the operator’s to confirm.

Microsoft

Source: PeeringDB carrier-to-facility records, matched to this site by location. A network listed here may sit in a neighbouring hall or an adjacent building at the same address, so presence is reported for the location rather than for a single suite.

Power generation nearby

DC Hub tracks 34 operating generating units totalling 3,553 MW within about 50 km of Mount Pleasant, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Coal2,044 MW · 4 units · 58%
Oil/Gas1,249 MW · 9 units · 35%
Utility-Scale Solar257 MW · 19 units · 7%
Wind3 MW · 2 units · 0%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Mount Pleasant tracked by DC Hub — compare power, operators, and grid context across the market.

Get the full global facility map + power scores & site-selection tools — DC Hub from $49 → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="microsoft-microsoft-mount-pleasant-ai-campus-ed53212e" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind