Microsoft DUB09 is a data center operated by Microsoft in Dublin, IE. It carries a reported power capacity of 50.0 MW and is currently operational. It sits in the Dublin data-center market on the EirGrid grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 100.8-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Dublin — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Dublin — the market this facility sits in (full deep-dive →).
Dublin's data center market is severely constrained, with a power availability crisis overshadowing otherwise robust physical infrastructure across 189 tracked facilities totaling 2,404 MW. The DCPI constraint score of 76/100—paired with excess-power capacity at only 24/100—signals acute scarcity rather than surplus. Google's recent planning permission victory after its South Dublin County Council dispute underscores regulatory appetite for expansion, yet the underlying power infrastructure deficit remains unresolved. New Dublin regulations are now pushing operators toward innovation in power solutions, a tacit acknowledgment that demand outpaces grid capacity. For acquisition-focused investors, the DCPI AVOID verdict is categorical: Dublin presents a structural mismatch between capital deployment expectations and market realities. A constraint score of 76/100 means available power…
Published DC Hub data for this location.
Networks recorded as present at or immediately around Microsoft DUB09 in public peering records. Treat this as a map of who is there, not as a list of contracted cross-connects — availability, diversity and pricing are the operator’s to confirm.
Further networks are recorded at this location beyond those listed here.
Source: PeeringDB carrier-to-facility records, matched to this site by location. A network listed here may sit in a neighbouring hall or an adjacent building at the same address, so presence is reported for the location rather than for a single suite.
DC Hub tracks 40 operating generating units totalling 3,653 MW within about 50 km of Dublin, IE. Generation mix shapes both carbon profile and interconnection options for a site at this location.
Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.
Comparable facilities in Dublin tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="microsoft-microsoft-dub09-ca1c5c35" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect