Microsoft Azure West Central US Wyoming

Azure West Central US Wyoming is a data center operated by Microsoft in Cheyenne, WY, US. The facility is currently operational. It sits in the Cheyenne data-center market on the WECC grid, which DC Hub's Data Center Power Index currently rates BUILD, with an estimated 10.8-month time-to-power. For operators evaluating new capacity, this market screens favorably — grid headroom and interconnection timelines are comparatively strong.

Status
Operational
Market
Cheyenne
State
WY
Country
US

Market intelligence

BUILD

Data Center Power Index verdict for Cheyenne — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Cheyenne — the market this facility sits in (full deep-dive →).

Cheyenne is consolidating as a high-capacity regional hub with acute power availability but minimal infrastructure constraint. The market spans 42 tracked facilities delivering 2,140 MW across a fragmented operator base, with no single player commanding dominant control. The top operator holds 10 facilities, matched by an equally-sized unknown entity, while Microsoft operates 6 sites and specialized players like the University Corporation for Atmospheric Research 2 facilities maintain niche presences. The absence of recent M&A activity—despite the market's scale—suggests a phase of organic growth rather than competitive consolidation. The DCPI verdict of BUILD excess-power 73/100, constraint 25/100 signals a market with structural tailwinds for greenfield development but without the supply-side friction that typically justifies premium acquisition multiples. The high excess-power score…

Location

Area Cheyenne, WY, US

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

MarketCheyenne
Grid operatorWECC
Data Center Power IndexBUILD
Est. time to power10.8 months
LocationCheyenne, US
Nearest substationwithin 5 km

Fiber connectivity

Networks recorded as present at or immediately around Azure West Central US Wyoming in public peering records. Treat this as a map of who is there, not as a list of contracted cross-connects — availability, diversity and pricing are the operator’s to confirm.

Microsoft

Source: PeeringDB carrier-to-facility records, matched to this site by location. A network listed here may sit in a neighbouring hall or an adjacent building at the same address, so presence is reported for the location rather than for a single suite.

Power generation nearby

DC Hub tracks 15 operating generating units totalling 1,584 MW within about 50 km of Cheyenne, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas638 MW · 6 units · 40%
Wind451 MW · 5 units · 28%
Coal294 MW · 1 unit · 19%
Utility-Scale Solar202 MW · 3 units · 13%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Cheyenne tracked by DC Hub — compare power, operators, and grid context across the market.

Get the full global facility map + power scores & site-selection tools — DC Hub from $49 → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="microsoft-azure-west-central-us-wyoming-09d56990" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind