Meta Montgomery Building 2 is a data center operated by Meta in Montgomery, AL, US. It carries a reported power capacity of 75.0 MW and is currently planned. It sits in the Montgomery data-center market on the SOCO grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 31.0-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Montgomery — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Montgomery — the market this facility sits in (full deep-dive →).
Montgomery's data center market comprises 310 MW across 8 tracked facilities, dominated by Meta's dual presence through both Meta Inc. and Meta Platforms with 6 combined assets, alongside smaller operators including Retirement Systems of Alabama and The Houston Bunker. The market shows material excess power capacity at 29/100 on the DCPI scale, paired with moderate infrastructure constraint at 50/100—a combination that signals oversupply relative to near-term absorption capacity. This excess-power condition reflects a market where available MW outpaces demand growth, creating downward pressure on utilization rates and pricing power. The AVOID verdict carries direct implications for acquisition-focused investors and operators considering Montgomery entry or expansion. An excess-power reading of 29/100 indicates that demand cannot absorb current and near-pipeline supply within a…
Published DC Hub data for this location.
Comparable facilities in Montgomery tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="meta-montgomery-building-2-160924ed" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=meta-montgomery-building-2-160924ed