Meta Montgomery Building 1 is a data center operated by Meta in Montgomery, AL, US. It carries a reported power capacity of 75.0 MW and is currently under construction. It sits in the Montgomery data-center market on the SOCO grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 17.2-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.
Data Center Power Index verdict for Montgomery — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Montgomery — the market this facility sits in (full deep-dive →).
Montgomery operates at an inflection point: five tracked facilities totaling 152 MW generate moderate but balanced constraints. The excess-power DCPI score of 44/100 signals tight but available capacity, while the constraint rating of 42/100 indicates similarly compressed interconnect and transmission headroom. Meta Platforms operates three of the five tracked facilities, establishing significant operator concentration, while Retirement Systems of Alabama and The Houston Bunker each operate single assets. No recent M&A has been recorded, despite the market's apparent maturity. The combined CAUTION verdict reflects a market neither abundantly loose nor acutely stressed. For buyers, this translates to actionable but narrow windows: power procurement remains possible but requires direct negotiation and likely long-term commitment; constraint relief requires either co-location with existing…
Comparable facilities in Montgomery tracked by DC Hub — compare power, operators, and grid context across the market.