Lancium Abilene is a data center operated by Lancium in Abilene, TX, US. It carries a reported power capacity of 300.0 MW and is currently operational. It sits in the Abilene data-center market on the ERCOT grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 27.3-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.
Data Center Power Index verdict for Abilene — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Abilene — the market this facility sits in (full deep-dive →).
Abilene's data center market is moderately capitalized but facing real infrastructure constraints. The market currently hosts 5,650 MW across 10 tracked facilities, with Oracle and OpenAI commanding 3 co-located sites and Oracle operating 2 additional facilities independently. The operator roster reflects early-stage consolidation: Crusoe Energy, LONGHORN DATA CENTER, and Lancium each operate single assets, indicating a market still fragmented between hyperscalers and emerging specialized players. Notably, no material M&A activity has registered in recent tracking periods, suggesting either market maturity or investor caution at the acquisition level. The DCPI verdict—excess-power rated 62/100 against a constraint reading of 51/100—signals a cautionary posture for acquisition-focused investors. While the 62-point excess-power score indicates available capacity headroom relative to peer…
Published DC Hub data for this location.
Comparable facilities in Abilene tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="lancium-abilene-f7cf0f4c" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect