InterBox Internet is a data center in Capelle aan den IJssel, NL. The facility is currently operational. It sits in the Rotterdam data-center market on the ENTSOE-NL grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 103.5-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Rotterdam — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Rotterdam — the market this facility sits in (full deep-dive →).
Rotterdam's data center market remains nascent and fragmented, with 56 tracked facilities totaling 0 MW of measurable capacity—a statistical artifact indicating that most operators run sub-MW installations or remain unmetered in available databases. NorthC Datacenters commands the largest identified footprint with 3 facilities, followed by an unnamed operator also operating 3 sites, while Unknown, NorthC, and Alticom Den each operate between 1–2 smaller nodes. The absence of recent M&A activity underscores the market's early-stage maturity and limited institutional interest to date. The DCPI verdict of AVOID carries specific weight for acquisition-focused investors: the constraint score of 66/100 signals acute grid-supply pressure that mirrors challenges seen in Brussels and approaches the severity observed in Dublin and Johannesburg. Paired against excess-power availability of only…
Published DC Hub data for this location.
Networks recorded as present at or immediately around InterBox Internet in public peering records. Treat this as a map of who is there, not as a list of contracted cross-connects — availability, diversity and pricing are the operator’s to confirm.
Source: PeeringDB carrier-to-facility records, matched to this site by location. A network listed here may sit in a neighbouring hall or an adjacent building at the same address, so presence is reported for the location rather than for a single suite.
DC Hub tracks 258 operating generating units totalling 11,009 MW within about 50 km of Capelle aan den IJssel, NL. Generation mix shapes both carbon profile and interconnection options for a site at this location.
Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.
Comparable facilities in Capelle aan den IJssel tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="interbox-internet-interbox-internet-38efd59c" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect