GrafiX Internet B.V. - Capelle

GrafiX Internet B.V. - Capelle is a data center operated by GrafiX Internet B.V. in Capelle aan den IJssel, ZH, NL. The facility is currently operational. It sits in the Rotterdam data-center market on the ENTSOE-NL grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 103.5-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Status
Operational
Market
Capelle Aan Den Ijssel
City
Capelle aan den IJssel
State
ZH
Country
NL

Market intelligence

AVOID

Data Center Power Index verdict for Rotterdam — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Rotterdam — the market this facility sits in (full deep-dive →).

Rotterdam's data center market remains nascent and fragmented, with 56 tracked facilities totaling 0 MW of measurable capacity—a statistical artifact indicating that most operators run sub-MW installations or remain unmetered in available databases. NorthC Datacenters commands the largest identified footprint with 3 facilities, followed by an unnamed operator also operating 3 sites, while Unknown, NorthC, and Alticom Den each operate between 1–2 smaller nodes. The absence of recent M&A activity underscores the market's early-stage maturity and limited institutional interest to date. The DCPI verdict of AVOID carries specific weight for acquisition-focused investors: the constraint score of 66/100 signals acute grid-supply pressure that mirrors challenges seen in Brussels and approaches the severity observed in Dublin and Johannesburg. Paired against excess-power availability of only…

Location

Area Capelle aan den IJssel, ZH, NL

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

MarketRotterdam
Grid operatorENTSOE-NL
Data Center Power IndexAVOID
Est. time to power103.5 months
LocationCapelle aan den IJssel, NL

Power generation nearby

DC Hub tracks 256 operating generating units totalling 10,568 MW within about 50 km of Capelle aan den IJssel, NL. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas5,146 MW · 27 units · 49%
Coal1,900 MW · 2 units · 18%
Wind1,450 MW · 57 units · 14%
Bioenergy1,072 MW · 11 units · 10%
Utility-Scale Solar1,000 MW · 159 units · 9%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Capelle aan den IJssel tracked by DC Hub — compare power, operators, and grid context across the market.

Get the full global facility map + power scores & site-selection tools — DC Hub from $49 → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="grafix-internet-bv-grafix-internet-bv-capelle-6a056458" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind