HSBC Wakefield Data Centre

HSBC Wakefield Data Centre is a data center in Normanton, GB. The facility is currently operational. It sits in the Manchester data-center market on the NGESO grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 134.4-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Status
Operational
Market
Normanton
Country
GB

Market intelligence

AVOID

Data Center Power Index verdict for Manchester — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Manchester — the market this facility sits in (full deep-dive →).

Manchester operates a fragmented 18 MW footprint across 80 facilities, dominated by Equinix's 8-site presence but characterized by thin capacity density and acute grid stress. The market's largest single operator commands less than half the tracked MW, indicating no consolidated platform and high operator fragmentation. Recent activity—including an Equinix-occupied facility changing hands to a new landlord and a proposed edge data center for AI workloads—signals underlying asset churn despite modest scale. The DCPI verdict of AVOID is decisive and unambiguous for acquisition-focused capital. The excess-power score of 20/100 signals severe grid headroom scarcity; paired with a constraint score of 70/100, the market presents a dual penalty structure where both incremental load capacity and existing infrastructure strain limit expansion economics. Operators seeking to deploy additional…

Location

Area Normanton, GB

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

MarketManchester
Grid operatorNGESO
Data Center Power IndexAVOID
Est. time to power134.4 months
LocationNormanton, GB

Power generation nearby

DC Hub tracks 96 operating generating units totalling 7,286 MW within about 50 km of Normanton, GB. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas3,652 MW · 13 units · 50%
Bioenergy2,872 MW · 13 units · 39%
Wind500 MW · 32 units · 7%
Utility-Scale Solar263 MW · 38 units · 4%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Normanton tracked by DC Hub — compare power, operators, and grid context across the market.

Get the full global facility map + power scores & site-selection tools — DC Hub from $49 → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="hsbc-wakefield-data-centre-7b072686" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind