Google West Memphis Campus

Google

West Memphis Campus is a data center operated by Google in West Memphis, AR, US. It carries a reported power capacity of 500.0 MW and is currently operational. It sits in the Memphis data-center market on the TVA grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 10.4-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Power
500.0 MW
Status
Operational
City
West Memphis
State
AR
Country
US
Coordinates
35.1465, -90.1846
Address
West Memphis, AR

Market intelligence

AVOID

Data Center Power Index verdict for Memphis — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Memphis — the market this facility sits in (full deep-dive →).

Memphis operates 33 tracked facilities totaling 5,600 MW across a fragmented operator base, with xAI commanding the largest footprint at seven facilities. The market's excess-power score of 35/100 signals chronic undersupply relative to current and near-term demand, while the constraint score of 28/100 reflects severe limitations on buildable capacity or grid headroom. This combination produces a DCPI verdict of AVOID, indicating structural headwinds that favor neither acquisition nor expansion strategies in the near term. For acquisition-focused investors, the DCPI rating is unambiguous: pass. The 35/100 excess-power score means available capacity cannot reliably service new tenant workloads without substantial infrastructure investment upstream—grid interconnection delays, transmission upgrades, or on-site generation. The constraint score of 28/100 is more acute: it signals that even…

Location

Open in OpenStreetMap →

Market & grid context

Published DC Hub data for this location.

MarketMemphis
Grid operatorTVA
DC Hub Power IndexAVOID
Est. time to power10.4 months
LocationWest Memphis, US
Reported capacity500.0 MW

Power generation nearby

DC Hub tracks 15 operating generating units totalling 3,178 MW within about 50 km of West Memphis, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas2,658 MW · 8 units · 84%
Utility-Scale Solar520 MW · 7 units · 16%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in West Memphis tracked by DC Hub — compare power, operators, and grid context across the market.

Get all 20,100+ facilities + power scores & site-selection tools — DC Hub from $49/mo → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="google-west-memphis-campus-020f5bce" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect?src=page-onramp&entity=google-west-memphis-campus-020f5bce
Schema, units and the population behind every count: https://dchub.cloud/bind