Google Mesa Building 3 is a data center operated by Google in Mesa, AZ, US. It carries a reported power capacity of 50.0 MW and is currently under construction. It sits in the Mesa data-center market on the WECC grid, which DC Hub's Data Center Power Index currently rates BUILD, with an estimated 13.2-month time-to-power. For operators evaluating new capacity, this market screens favorably — grid headroom and interconnection timelines are comparatively strong.
Data Center Power Index verdict for Mesa — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Mesa — the market this facility sits in (full deep-dive →).
Mesa's data center market comprises 53 tracked facilities totaling 1,425 MW across a fragmented operator base, with no single dominant player and no recent M&A activity. The market's top operators are largely unknown entities 13 facilities, followed by EdgeCore Digital Infrastructure and EdgeCore 4 facilities each and Meta 3 facilities. This fragmentation reflects a market still in formation, lacking the consolidation seen in mature peers like Gilbert and Chandler, where smaller regional players predominate without acquisition pressure. The DCPI verdict of BUILD—driven by excess-power availability 65/100 and moderate power constraints 40/100—signals a favorable window for greenfield development over acquisition strategies. The high excess-power score indicates reliable availability of electrical capacity relative to current utilization, reducing development risk around interconnection…
Exact location not on record.
Published DC Hub data for this location.
Comparable facilities in Mesa tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="google-google-mesa-building-3-c717cb39" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect