Edged Tahoe Reno 1 is a data center operated by Edged in Reno, NV, US. It carries a reported power capacity of 50.0 MW and is currently operational. It sits in the Reno data-center market on the WECC grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 11.3-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.
Data Center Power Index verdict for Reno — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Reno — the market this facility sits in (full deep-dive →).
Reno's data center footprint spans 1,190 MW across 63 tracked facilities, positioning it as a meaningful secondary market, though operator concentration remains fragmented with no single dominant player. Unknown operators control 17 facilities, while Switch operates 6 sites—the largest tracked presence. Microsoft and Cogent Communications each maintain 2 facilities, indicating selective rather than aggressive deployment by hyperscalers. The absence of recent M&A activity suggests the market has not yet attracted consolidation capital, leaving acquisition opportunities largely untapped. The CAUTION verdict reflects a mixed risk profile that demands selective strategy. An excess-power score of 50/100 signals moderate available capacity, neither constraining nor abundant, while the constraint score of 38/100 indicates meaningful headroom in land and infrastructure before saturation. For…
Published DC Hub data for this location.
Comparable facilities in Reno tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="edged-edged-tahoe-reno-1-83aaa048" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=edged-edged-tahoe-reno-1-83aaa048