Edged Moses Lake

Edged Moses Lake is a data center operated by Edged in Moses Lake, WA, US. It carries a reported power capacity of 60.0 MW and is currently operational. It sits in the Moses Lake data-center market on the WECC grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 17.8-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.

Power
60.0 MW
Status
Operational
Market
Pacific Northwest
City
Moses Lake
State
WA
Country
US

Market intelligence

CAUTION

Data Center Power Index verdict for Moses Lake — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Moses Lake — the market this facility sits in (full deep-dive →).

Moses Lake operates as a fragmented 350 MW market across four tracked facilities with no dominant operator, split evenly among Edged, Microsoft, Prime Data Centers, and ServerFarm. The region faces mixed fundamental conditions: excess power capacity scores a healthy 50/100, indicating reasonable availability, but infrastructure constraints register 40/100—a material friction point that caps the upside. This tension between supply and bottleneck generates the CAUTION verdict, signaling neither opportunity nor crisis, but rather a market requiring surgical deal structuring. For acquisition-focused investors, the CAUTION classification demands precision over aggression. The constraint score of 40/100 indicates that expansion capital will face real friction costs—likely grid interconnection delays, transmission upgrades, or water/cooling limitations typical of Eastern Washington industrial…

Location

Area Moses Lake, WA, US

Exact location not on record.

Market & grid context

Published DC Hub data for this location.

MarketMoses Lake
Grid operatorWECC
Data Center Power IndexCAUTION
Est. time to power17.8 months
LocationMoses Lake, US
Reported capacity60.0 MW

Other data centers nearby

Comparable facilities in Moses Lake tracked by DC Hub — compare power, operators, and grid context across the market.

Get the full global facility map + power scores & site-selection tools — DC Hub from $49 → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="edged-edged-moses-lake-1bf4e7c4" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind