Serverfarm TiTAN Moses Lake

Serverfarm TiTAN Moses Lake is a data center operated by Serverfarm in Moses Lake, WA, US. The facility is currently operational. It sits in the Moses Lake data-center market on the WECC grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 17.8-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.

Status
Operational
Market
Moses Lake
State
WA
Country
US

Market intelligence

CAUTION

Data Center Power Index verdict for Moses Lake — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Moses Lake — the market this facility sits in (full deep-dive →).

Moses Lake operates as a fragmented 350 MW market across four tracked facilities with no dominant operator, split evenly among Edged, Microsoft, Prime Data Centers, and ServerFarm. The region faces mixed fundamental conditions: excess power capacity scores a healthy 50/100, indicating reasonable availability, but infrastructure constraints register 40/100—a material friction point that caps the upside. This tension between supply and bottleneck generates the CAUTION verdict, signaling neither opportunity nor crisis, but rather a market requiring surgical deal structuring. For acquisition-focused investors, the CAUTION classification demands precision over aggression. The constraint score of 40/100 indicates that expansion capital will face real friction costs—likely grid interconnection delays, transmission upgrades, or water/cooling limitations typical of Eastern Washington industrial…

Location

Area Moses Lake, WA, US

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

MarketMoses Lake
Grid operatorWECC
Data Center Power IndexCAUTION
Est. time to power17.8 months
LocationMoses Lake, US
Nearest substationwithin 1 km

Fiber connectivity

Networks recorded as present at or immediately around Serverfarm TiTAN Moses Lake in public peering records. Treat this as a map of who is there, not as a list of contracted cross-connects — availability, diversity and pricing are the operator’s to confirm.

FatbeamServerFarm Realty

Source: PeeringDB carrier-to-facility records, matched to this site by location. A network listed here may sit in a neighbouring hall or an adjacent building at the same address, so presence is reported for the location rather than for a single suite.

Power generation nearby

DC Hub tracks 2 operating generating units totalling 1,312 MW within about 50 km of Moses Lake, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Hydropower1,312 MW · 2 units · 100%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Moses Lake tracked by DC Hub — compare power, operators, and grid context across the market.

Get the full global facility map + power scores & site-selection tools — DC Hub from $49 → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="serverfarm-serverfarm-titan-moses-lake-bc9ef7f5" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind