Serverfarm TiTAN Moses Lake is a data center operated by Serverfarm in Moses Lake, WA, US. The facility is currently operational. It sits in the Moses Lake data-center market on the WECC grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 17.8-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.
Data Center Power Index verdict for Moses Lake — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Moses Lake — the market this facility sits in (full deep-dive →).
Moses Lake operates as a fragmented 350 MW market across four tracked facilities with no dominant operator, split evenly among Edged, Microsoft, Prime Data Centers, and ServerFarm. The region faces mixed fundamental conditions: excess power capacity scores a healthy 50/100, indicating reasonable availability, but infrastructure constraints register 40/100—a material friction point that caps the upside. This tension between supply and bottleneck generates the CAUTION verdict, signaling neither opportunity nor crisis, but rather a market requiring surgical deal structuring. For acquisition-focused investors, the CAUTION classification demands precision over aggression. The constraint score of 40/100 indicates that expansion capital will face real friction costs—likely grid interconnection delays, transmission upgrades, or water/cooling limitations typical of Eastern Washington industrial…
Published DC Hub data for this location.
Networks recorded as present at or immediately around Serverfarm TiTAN Moses Lake in public peering records. Treat this as a map of who is there, not as a list of contracted cross-connects — availability, diversity and pricing are the operator’s to confirm.
Source: PeeringDB carrier-to-facility records, matched to this site by location. A network listed here may sit in a neighbouring hall or an adjacent building at the same address, so presence is reported for the location rather than for a single suite.
DC Hub tracks 2 operating generating units totalling 1,312 MW within about 50 km of Moses Lake, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.
Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.
Comparable facilities in Moses Lake tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="serverfarm-serverfarm-titan-moses-lake-bc9ef7f5" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: