Equinix CU1/CU2/CU3/CU4 - Culpeper

Equinix CU1/CU2/CU3/CU4 - Culpeper is a data center operated by Equinix in Culpeper, VA, US. The facility is currently operational. It sits in the Culpeper data-center market on the PJM grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 31.6-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Status
Operational
Market
Culpeper
State
VA
Country
US

Market intelligence

AVOID

Data Center Power Index verdict for Culpeper — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Culpeper — the market this facility sits in (full deep-dive →).

Culpeper hosts seven tracked facilities totaling 216 MW, dominated by Equinix's four-facility footprint across multiple operators. The market shows fragmentation typical of secondary Virginia markets, with EdgeCore Digital Infrastructure and EQUINIX, LLC - CU 1-4 holding minority positions. This distributed operational structure contrasts with consolidated markets where single operators control 60%+ of capacity, suggesting limited economies of scale and coordination potential for new entrants. The DCPI verdict of AVOID, driven by an excess-power score of 46/100 paired with a constraint score of 41/100, signals fundamental infrastructure misalignment. An excess-power rating below 50 indicates insufficient power headroom for incremental workload absorption—critical for hyperscaler and AI-driven expansion. The constraint score of 41 reinforces this concern, suggesting grid infrastructure…

Location

Area Culpeper, VA, US

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

MarketCulpeper
Grid operatorPJM
Data Center Power IndexAVOID
Est. time to power31.6 months
LocationCulpeper, US
Nearest substationwithin 1 km

Fiber connectivity

Networks recorded as present at or immediately around Equinix CU1/CU2/CU3/CU4 - Culpeper in public peering records. Treat this as a map of who is there, not as a list of contracted cross-connects — availability, diversity and pricing are the operator’s to confirm.

AVCtechnologies USA Inc. AS201573AVCtechnologies USA Inc. AS56521C3AeroCRUSOE ENERGY SYSTEMS LLCCogent Communications, Inc.GENBAND NUVIAJuxto IncLUMOS Networks, Inc.TIGRISDATAZayo

Source: PeeringDB carrier-to-facility records, matched to this site by location. A network listed here may sit in a neighbouring hall or an adjacent building at the same address, so presence is reported for the location rather than for a single suite.

Power generation nearby

DC Hub tracks 34 operating generating units totalling 5,866 MW within about 50 km of Culpeper, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas3,010 MW · 19 units · 51%
Nuclear2,001 MW · 2 units · 34%
Utility-Scale Solar856 MW · 13 units · 15%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Culpeper tracked by DC Hub — compare power, operators, and grid context across the market.

Get the full global facility map + power scores & site-selection tools — DC Hub from $49 → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="equinix-equinix-cu1cu2cu3cu4-culpeper-a374a978" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind