EdgeConneX Las Vegas (EDCLAS01)

EdgeConneX

EdgeConneX Las Vegas (EDCLAS01) is a data center operated by EdgeConneX in Las Vegas, NV, US. The facility is currently operational. It sits in the Las Vegas data-center market on the WECC grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 11.5-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.

Status
Operational
City
Las Vegas
State
NV
Country
US
Coordinates
36.0653, -115.1308
Address
1541 Pama Ln

Market intelligence

CAUTION

Data Center Power Index verdict for Las Vegas — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Las Vegas — the market this facility sits in (full deep-dive →).

Las Vegas operates 1,840 MW across 75 tracked facilities, but faces a paradoxical constraint despite nominally excess power availability. The excess-power DCPI score of 53/100 indicates marginal surplus capacity, while the constraint score of 39/100 signals that physical, regulatory, or interconnection barriers prevent ready deployment of that power. Recent regulatory discussion—including city-level expansion approvals coupled with official consideration of future compliance frameworks—suggests that available MW may be committed or encumbered in ways the headline excess-power metric does not capture. Switch's dominance with 16 facilities underscores operator consolidation, yet the fragmentation across Flexential 6 and 3 facilities listed separately, Unknown 5, and DataBank 3 indicates either data opacity or genuine multi-operator deployment. For acquisition-focused investors, the…

Location

Open in OpenStreetMap →

Market & grid context

Published DC Hub data for this location.

MarketLas Vegas
Grid operatorWECC
DC Hub Power IndexCAUTION
Est. time to power11.5 months
LocationLas Vegas, US

Power generation nearby

DC Hub tracks 90 operating generating units totalling 11,695 MW within about 50 km of Las Vegas, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas6,492 MW · 31 units · 56%
Utility-Scale Solar3,119 MW · 57 units · 27%
Hydropower2,080 MW · 1 unit · 18%
Geothermal4 MW · 1 unit · 0%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Las Vegas tracked by DC Hub — compare power, operators, and grid context across the market.

Get all 20,100+ facilities + power scores & site-selection tools — DC Hub from $49/mo → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="edgeconnex-edgeconnex-las-vegas-edclas01-3ac7175f" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect?src=page-onramp&entity=edgeconnex-edgeconnex-las-vegas-edclas01-3ac7175f
Schema, units and the population behind every count: https://dchub.cloud/bind