DC BLOX Chattanooga is a data center operated by DC BLOX in Chattanooga, TN, US. It carries a reported power capacity of 12.0 MW and is currently operational. It sits in the Chattanooga data-center market on the TVA grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 9.9-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Chattanooga — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Chattanooga — the market this facility sits in (full deep-dive →).
Chattanooga's data center infrastructure remains underdeveloped, with only 6 tracked facilities delivering 12 MW of total capacity across a fragmented operator base. The market is dominated by DC BLOX with two facilities and Google with two facilities, while Peace Communications and a secondary Google entity each operate single sites. This minimal installed base reflects a market still in early stages, with power infrastructure lagging behind demand signals evident in regional policy conversations. The DCPI verdict of AVOID stems directly from structural constraints that should deter near-term capital deployment. The excess-power score of 37/100 indicates insufficient surplus generation capacity to accommodate incremental data center loads without triggering grid infrastructure upgrades—a capital-intensive and time-consuming barrier. More critically, the constraint score of 24/100…
Exact location not on record.
Published DC Hub data for this location.
Comparable facilities in Chattanooga tracked by DC Hub — compare power, operators, and grid context across the market.