DC BLOX Chattanooga is a data center operated by DC BLOX in Chattanooga, TN, US. It carries a reported power capacity of 12.0 MW and is currently operational. It sits in the Chattanooga data-center market on the TVA grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 10.0-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Chattanooga — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Chattanooga — the market this facility sits in (full deep-dive →).
Chattanooga's data center footprint remains modest at 18 MW across 6 tracked facilities, with a fragmented operator base dominated by DC BLOX two facilities and Google two facilities, alongside single-asset holders Peace Communications and a smaller independent operator. The market's power profile presents a critical constraint: a DCPI excess-power score of 40/100 indicates moderate available capacity, but the constraint score of 26/100 reveals severe structural limitations on expansion potential. This combination—adequate current supply coupled with minimal headroom for growth—creates a fundamentally constrained environment that favors incumbents with locked-in power allocations over new entrants or acquirers seeking to scale. The AVOID verdict is unambiguous for acquisition-focused investors. A constraint score of 26/100 means that any meaningful expansion beyond the current 18 MW…
Published DC Hub data for this location.
Comparable facilities in Chattanooga tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="dc-blox-dc-blox-chattanooga-01b0fc04" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=dc-blox-dc-blox-chattanooga-01b0fc04