Data Center 755540694

Data Center 755540694 is a data center in Flint, MI, US. The facility is currently operational. It sits in the Southfield data-center market on the MISO grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 30.3-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.

Status
Operational
Market
Flint
State
MI
Country
US

Market intelligence

CAUTION

Data Center Power Index verdict for Southfield — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Southfield — the market this facility sits in (full deep-dive →).

Southfield's data center market remains a small, fragmented footprint with mounting infrastructure pressure. Twelve tracked facilities across 8 MW of capacity are distributed among five operators, with no single player commanding meaningful market share: 123.Net, LLC leads with three facilities, while ManagedWay Company, 365 Data Centers, and EdgeConneX each operate between one and two sites. The operator landscape is highly atomized—no single entity controls more than 25% of tracked capacity—which limits both economies of scale and consolidation momentum. The DCPI verdict of CAUTION reflects a market caught between conflicting pressures. Excess-power scores 51/100 just barely above neutrality, signaling tight supply-demand balance with limited headroom for growth workloads. More concerning is the constraint score of 53/100, indicating that power infrastructure—not colocation space—is…

Location

Area Flint, MI, US

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

MarketSouthfield
Grid operatorMISO
Data Center Power IndexCAUTION
Est. time to power30.3 months
LocationFlint, US
Nearest substationwithin 5 km

Power generation nearby

DC Hub tracks 14 operating generating units totalling 390 MW within about 50 km of Flint, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Utility-Scale Solar350 MW · 13 units · 90%
Bioenergy40 MW · 1 unit · 10%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Flint tracked by DC Hub — compare power, operators, and grid context across the market.

Get the full global facility map + power scores & site-selection tools — DC Hub from $49 → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="data-center-755540694-1cd5cc72" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind