Data Center 1128589933 is a data center in Leesburg, VA, US. The facility is currently operational. It sits in the Leesburg data-center market on the PJM grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 21.5-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Leesburg — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Leesburg — the market this facility sits in (full deep-dive →).
Leesburg's 33 tracked facilities spanning 205 MW represent a fragmented, operator-diverse market constrained by infrastructure limitations. The portfolio is heavily weighted toward unnamed operators 10 facilities, followed by a single dominant player with 11 sites, True North Data Solutions with 6 MW, and Google with 2 MW. This distribution—no single operator controlling more than one-third of capacity—signals a market still in formation rather than consolidation. The excess-power score of 46/100 indicates tight generator capacity relative to load, a structural disadvantage in competitive procurement. The DCPI verdict of AVOID reflects genuine friction for acquisition-stage investors. The constraint score of 57/100 places Leesburg in the problematic middle ground: not so constrained as to command premium pricing, but sufficiently bottlenecked to prevent straightforward expansion.…
Published DC Hub data for this location.
Comparable facilities in Leesburg tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="data-center-1128589933-bd1ccf94" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=data-center-1128589933-bd1ccf94