CoreSite VA2 is a data center operated by CoreSite in Reston, VA, US. It carries a reported power capacity of 40.0 MW and is currently operational. It sits in the Reston data-center market on the PJM grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 20.5-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Reston — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Reston — the market this facility sits in (full deep-dive →).
Reston's data center market remains underdeveloped relative to its Northern Virginia peers, with 19 tracked facilities totaling 362 MW concentrated heavily under CoreSite's 13-facility portfolio. The market's excess-power score of 47/100 signals acute supply constraints, while a constraint rating of 55/100 places operational and land bottlenecks at moderate-to-elevated levels. This bifurcated profile—surplus generation capacity coupled with physical and infrastructural friction—creates structural inefficiency in the market's ability to absorb incremental demand. The AVOID verdict reflects a fundamental mismatch between buyer ambitions and market realities. Excess power alone does not signal opportunity; the constraint score of 55/100 indicates that land availability, cooling infrastructure, and grid integration remain friction points that offset apparent generation surplus. For…
Published DC Hub data for this location.
Comparable facilities in Reston tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="coresite-coresite-va2-3b1ab080" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=coresite-coresite-va2-3b1ab080