Power availability in Reston: DCPI verdict AVOID, composite score 22.1 of 100, as of 2026-10-20. Source: DC Hub.

Data Center Market Deep-Dive · 364 words · generated 2026-10-19 from live DC Hub data · DCPI live as of 2026-10-20

DCPI Score22.1/100
Total MW204sum of the sites that report MW; most do notany status, unverified listings included
VerdictAVOID

This analysis was written on 2026-10-19, when the Data Center Power Index for this market read 24.5. The index is recomputed through the day and reads 22.1 now — the figure above is the live one, and the narrative below describes the market as it stood when it was written.

Reston at a glance

Reston has 74 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-10-20. By listed capacity the largest operators are CoreSite (60 MW) and Digital Realty (14 MW).

Capacity by status, as of 2026-10-20
StatusMW
Operational74
Total listed74

Source: DC Hub (dchub.cloud), facility records as of 2026-10-20. Verified sites that report MW only; blank means no MW reported. The Total MW tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

Colocation lease rates in Reston

DC Hub does not hold a lease-rate figure for this market yet.

Reston's data center market comprises tracked facilities totaling 204 MW, dominated by CoreSite's facility footprint. The market's infrastructure reflects Northern Virginia's regional significance, yet the DCPI assessment reveals acute operational constraints.

For acquisition-focused investors, this means capital deployed to Reston faces hard limits on utilization growth. Buyers entering this market should expect extended timelines to reach operational breakeven and face competitive headwinds against incumbent operators already locked into stable customer bases.

Deal flow in Reston has stalled; no recent M&A is tracked, a notable silence given the $65 million Amazon Virginia acquisition and the $232.3 million McLean data center exit that occurred nearby. CoreSite's facility concentration underscores market consolidation around a single operator, reducing competitive dynamism. Digital Realty maintains a minimal two-facility presence, while Anexio, Data Centers, and Evocative each operate single sites, suggesting fragmentation below the tier-one operator. This operator structure creates a two-tier market: CoreSite commanding scale and utilization flexibility, while smaller operators compete on niche service delivery or customer retention. The absence of recent M&A despite regional activity elsewhere implies either seller reluctance at current valuations or buyer wariness of Reston-specific constraints—likely both.

Community friction over data center expansion compounds investment friction: residential complaints about construction noise and light pollution have generated local media coverage, signaling potential zoning pressure or regulatory tightening. Blackstone's QTS subsidiary leased 77,000 square feet at Reston Station, demonstrating that tier-one operators can still secure space, though the move to trophy office real estate (rather than additional data center capacity) reflects a shift toward administrative presence over compute expansion. Forward-looking investors should monitor whether Reston's constraint score reflects permanent grid limitations, permitting backlogs, or cyclical cooling—resolution of any will dictate timing for re-entry.

Data centers in Reston

FacilityOperatorStatusMW
CoreSite VA CampusCoreSiteOperational60
VA3Digital RealtyOperational14
CoreSite - Reston (VA1)CoreSiteOperational
CoreSite - Reston (VA2)CoreSiteOperational
CoreSite - Reston (VA3)CoreSiteOperational
Digital Realty IAD (1780 Business Center)Digital RealtyOperational

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in Virginia.

More on Reston

Email me when the Reston DCPI verdict changes

Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).

Reston: 204 MW tracked, any status — live, cited, and queryable by API or MCP.

Pro $99 · or $10 one-time = 1,000 API credits (1 per call, 5 for heavy tools). Pro-only tools not included.

Unlock full market data → · Get an API key →

JSON: /api/v1/markets/reston/deep-dive · DCPI: /dcpi · Operators: /operators · Updated nightly