BendTel is a data center in Bend, OR, US. It carries a reported power capacity of 3.0 MW and is currently operational. It sits in the Bend data-center market on the WECC grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 17.2-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Bend — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Bend — the market this facility sits in (full deep-dive →).
Bend operates as a micro-scale, fragmented market with 9 MW across 8 facilities—placing it at the periphery of institutional data center investment. The operator base is highly distributed: Fort Rock Data Center and US Signal each operate two facilities, while BendTel, OneNeck IT Solutions LLC, and one additional operator each manage single sites. This fragmentation mirrors smaller peer markets like Portland, ME 19 MW and Billings, where institutional capital has shown minimal appetite, though Bend's 9 MW footprint represents a materially smaller addressable opportunity. The DCPI verdict of AVOID reflects fundamental market constraints that should deter entry-stage institutional investors. The excess-power score of 47/100 indicates insufficient capacity cushion to accommodate large tenant expansions without infrastructure buildout; the constraint score of 45/100 signals that existing…
Published DC Hub data for this location.
Comparable facilities in Bend tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="bendtel-bendtel-861a5004" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=bendtel-bendtel-861a5004