ATC Edge TIJ/E1

ATC Edge TIJ/E1 is a data center operated by ATC HOLDING FIBRA MEXICO in Tijuana, Baja California, MX. The facility is currently operational. It sits in the San Diego data-center market on the CAISO grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 41.0-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.

Status
Operational
Market
Tijuana
State
Baja California
Country
MX

Market intelligence

CAUTION

Data Center Power Index verdict for San Diego — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on San Diego — the market this facility sits in (full deep-dive →).

San Diego's data center market remains fragmented and undersized, with 48 tracked facilities but zero reported MW capacity in the inventory—a data gap that itself signals limited institutional coverage or an early-stage market. The operator landscape is highly distributed: three facilities each claimed by EdgeConneX, DataBank, and an Unknown entity, with Cogent Communications San Diego and Ais Data Centers each operating two sites. No recent M&A activity has registered in the tracking system, suggesting either organic growth dominance or deal opacity in this secondary market. The CAUTION verdict on DCPI metrics—excess-power at 66/100 paired with constraint at 51/100—reflects a market in structural tension. Elevated excess power indicates available capacity relative to current demand, typically favorable for lease rates and tenant accommodation; however, the midrange constraint score…

Location

Area Tijuana, Baja California, MX

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

MarketSan Diego
Grid operatorCAISO
Data Center Power IndexCAUTION
Est. time to power41.0 months
LocationTijuana, MX
Nearest substationwithin 10 km

Power generation nearby

DC Hub tracks 36 operating generating units totalling 3,114 MW within about 50 km of Tijuana, MX. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas3,085 MW · 19 units · 99%
Utility-Scale Solar29 MW · 17 units · 1%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Tijuana tracked by DC Hub — compare power, operators, and grid context across the market.

Get the full global facility map + power scores & site-selection tools — DC Hub from $49 → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="atc-holding-fibra-mexico-atc-edge-tije1-5566543d" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind