ELN02 is a data center operated by Applied Digital in Ellendale, ND, US. It carries a reported power capacity of 3.0 MW and is currently operational. It sits in the Ellendale data-center market on the MISO grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 27.3-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.
Data Center Power Index verdict for Ellendale — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Ellendale — the market this facility sits in (full deep-dive →).
Ellendale is a constrained market with moderate power availability and significant operational friction. Three tracked facilities totaling 400 MW represent a compact, concentrated footprint dominated by Applied Digital, which operates all tracked assets. The excess-power score of 40/100 indicates tight supply-demand balance, while the constraint metric of 49/100 signals meaningful infrastructure or permitting headwinds that are neither catastrophic nor trivial. The CAUTION verdict reflects a market where capital deployment carries material execution risk. Buyers entering Ellendale should interpret the constraint score as a warning that expansion plans face non-trivial headwinds—likely permitting delays, transmission interconnection queues, or water/cooling limitations. The 40/100 excess-power reading means there is spare capacity, but not abundance; new anchor tenants would consume…
Comparable facilities in Ellendale tracked by DC Hub — compare power, operators, and grid context across the market.