Applied Digital Jamestown is a data center operated by Applied Digital in Jamestown, ND, US. It carries a reported power capacity of 200.0 MW and is currently operational.
Source: third-party directory · As of: · Basis: estimated (what this means)
In the Ellendale market on the MISO grid, Applied Digital Jamestown’s 200 MW is about 50% of the 400 MW DC Hub’s brief counts there. Read the Ellendale market brief →
Exact location not on record.
Published DC Hub data for this location.
In Jamestown, closest in size to this facility.
get_facility slug="applied-digital-applied-digital-jamestown-9099884d" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect