Applied Digital Jamestown is a data center operated by Applied Digital in Jamestown, ND, US. It carries a reported power capacity of 200.0 MW and is currently operational. It sits in the Ellendale data-center market on the MISO grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 13.4-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Ellendale — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Ellendale — the market this facility sits in (full deep-dive →).
Ellendale's data center market remains thin and operator-concentrated, with just 400 MW across 4 tracked facilities dominated entirely by Applied Digital's portfolio. The market shows limited diversification—a single operator controlling all tracked capacity creates execution and counterparty risk for investors considering entry. This tight footprint suggests either nascent market development or saturation at a small scale, neither of which is conducive to institutional capital deployment. The DCPI verdict of AVOID reflects a market caught between competing constraints. An excess-power score of 40/100 indicates the region lacks sufficient power headroom to absorb incremental facility expansion without grid upgrades, while the constraint rating of 32/100 signals structural infrastructure bottlenecks—likely transmission or interconnection limitations—that would delay or derisk brownfield…
Exact location not on record.
Published DC Hub data for this location.
Comparable facilities in Jamestown tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="applied-digital-applied-digital-jamestown-9099884d" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect