Apple Maiden NC Campus

Apple Maiden NC Campus is a data center operated by Apple in Maiden, NC, US. The facility is currently operational. It sits in the Maiden data-center market on the SERC grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 10.8-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Status
Operational
Market
Maiden
State
NC
Country
US

Market intelligence

AVOID

Data Center Power Index verdict for Maiden — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Maiden — the market this facility sits in (full deep-dive →).

Maiden is a nascent, underdeveloped market with minimal operational footprint and severe structural constraints. The market currently tracks only 5 facilities totaling 0 MW of deployed capacity, indicating either pre-revenue assets or a market still in early site acquisition phases. Operator concentration is extreme: four unnamed operators control the bulk of tracked assets, while Apple maintains a single facility presence. The absence of recent M&A activity reflects both market immaturity and limited deal momentum compared to adjacent North Carolina regions where larger transactions—including WhiteFiber's two-site North Carolina acquisition and the reported $10 billion North Carolina rural data center deal—demonstrate competitive pressure elsewhere in the state. The DCPI verdict of AVOID carries material weight for institutional investors. The excess-power score of 38/100 signals…

Location

Area Maiden, NC, US

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

MarketMaiden
Grid operatorSERC
Data Center Power IndexAVOID
Est. time to power10.8 months
LocationMaiden, US
Nearest substationwithin 5 km

Fiber connectivity

Networks recorded as present at or immediately around Apple Maiden NC Campus in public peering records. Treat this as a map of who is there, not as a list of contracted cross-connects — availability, diversity and pricing are the operator’s to confirm.

Apple Inc.

Source: PeeringDB carrier-to-facility records, matched to this site by location. A network listed here may sit in a neighbouring hall or an adjacent building at the same address, so presence is reported for the location rather than for a single suite.

Power generation nearby

DC Hub tracks 98 operating generating units totalling 9,636 MW within about 50 km of Maiden, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas4,376 MW · 30 units · 45%
Nuclear2,430 MW · 2 units · 25%
Coal1,996 MW · 4 units · 21%
Hydropower446 MW · 3 units · 5%
Utility-Scale Solar388 MW · 59 units · 4%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Maiden tracked by DC Hub — compare power, operators, and grid context across the market.

Get the full global facility map + power scores & site-selection tools — DC Hub from $49 → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="apple-apple-maiden-nc-campus-297cb86d" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind