Data Center 873137563 is a data center in Maiden, NC, US. The facility is currently operational. It sits in the Maiden data-center market on the SERC grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 10.8-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Maiden — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Maiden — the market this facility sits in (full deep-dive →).
Maiden is a nascent market with minimal operational infrastructure and constrained growth capacity. Five tracked facilities represent 0 MW of operational capacity, indicating that the market remains in early-stage development. The operator base is concentrated, dominated by a single major player 4 facilities with Apple maintaining a single facility presence. This fragmentation and lack of scale differentiate Maiden from mature regional markets and suggest a market still establishing baseline infrastructure rather than competing for incremental capacity. The DCPI verdict of AVOID is unambiguous for acquisition-focused and capacity-constrained investors. The excess-power score of 37/100 indicates Maiden lacks meaningful surplus generation capacity—critical for data center operations that require high reliability and growth headroom. More problematically, the constraint score of 29/100…
Published DC Hub data for this location.
Comparable facilities in Maiden tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="data-center-873137563-5230e39c" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=data-center-873137563-5230e39c