Amazon IAD103 — Manassas Data Center

Last updated

Amazon IAD103 is a data center operated by Amazon Web Services in Manassas, VA, US. The facility is currently operational. It sits in the Manassas data-center market on the PJM grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 38.3-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Status
Operational
Market
Northern Virginia
City
Manassas
State
VA
Country
US

What changed

Changes DC Hub has recorded to this facility’s record, newest first.

Market intelligence

AVOID

Data Center Power Index verdict for Manassas — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Manassas — the market this facility sits in (full deep-dive →).

Manassas operates as a secondary Northern Virginia hub with modest scale and tightening infrastructure constraints. The market currently hosts 93 tracked facilities totaling 1,466 MW, with AWS commanding significant presence across 30 MW of tracked capacity split between AWS and Amazon Web Services entities. The operator base remains fragmented—no single player dominates beyond AWS—with CloudHQ, Unknown entities, and smaller operators filling the remainder. This distributional pattern suggests the market lacks the consolidation seen in mature hubs, presenting both opportunity and execution risk. The DCPI verdict of AVOID reflects material headwinds that should deter acquisition-stage capital deployment. An excess-power score of 45/100 signals tight available capacity relative to local demand, while a constraint rating of 53/100 places infrastructure at the inflection point where…

Location

Area Manassas, VA, US

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

MarketManassas
Grid operatorPJM
Data Center Power IndexAVOID
Est. time to power38.3 months
LocationManassas, US
Nearest substationwithin 1 km

Fiber connectivity

Networks recorded as present at or immediately around Amazon IAD103 in public peering records. Treat this as a map of who is there, not as a list of contracted cross-connects — availability, diversity and pricing are the operator’s to confirm.

Amazon.com

Source: PeeringDB carrier-to-facility records, matched to this site by location. A network listed here may sit in a neighbouring hall or an adjacent building at the same address, so presence is reported for the location rather than for a single suite.

Power generation nearby

DC Hub tracks 50 operating generating units totalling 3,210 MW within about 50 km of Manassas, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas2,859 MW · 11 units · 89%
Utility-Scale Solar198 MW · 35 units · 6%
Bioenergy153 MW · 4 units · 5%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Manassas tracked by DC Hub — compare power, operators, and grid context across the market.

Get the full global facility map + power scores & site-selection tools — DC Hub from $49 → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="amazon-web-services-amazon-iad103-3c3c9f43" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind