Power availability in Manassas, VA: DCPI verdict AVOID, composite score 20.3 of 100, as of 2026-11-18. Source: DC Hub.
Data Center Market Deep-Dive · 195 words · generated 2026-11-16 from live DC Hub data · DCPI live as of 2026-11-18
Manassas, VA has 868 MW operational and 200 MW under construction among the verified sites DC Hub lists that report capacity, as of 2026-11-18. By listed capacity the largest operators are Amazon Web Services (800 MW), STACK Infrastructure (200 MW) and COPT (48 MW).
| Status | MW |
|---|---|
| Operational | 868 |
| Under construction | 200 |
| Total listed | 1,068 |
| Operator | Under construction MW | Planned MW |
|---|---|---|
| STACK Infrastructure | 200 |
Source: DC Hub (dchub.cloud), facility records as of 2026-11-18. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it can be larger than Total listed.
DC Hub does not hold a lease-rate figure for this market yet.
COPT, Quality Technology Services, and STACK Infrastructure each maintain single-site presence. No recent deal activity has been tracked in Manassas.
Together, these metrics point to structural friction in securing new supply capacity. Prospective operators should model power procurement timelines conservatively and verify grid interconnection feasibility before committing to site development or lease terms.
Deal flow remains dormant. The absence of recent transactions contrasts with activity across neighboring Northern Virginia submarkets, where Digital Realty, Aligned Data Centers, and other operators have announced major acquisitions and investments. Microsoft's filing to develop a campus in Prince William County underscores continued regional appetite, though not necessarily in Manassas proper. The concentration of AWS presence—16 sites against a handful of other operators—reflects historical build-out patterns but does not indicate near-term expansion.
Power adequacy will remain a primary site selection criterion in Manassas until transmission and distribution infrastructure upgrades materialize.
| Facility | Operator | Status | MW |
|---|---|---|---|
| STACK NVA05 Campus | STACK Infrastructure | Under Construction | 200 |
| AWS IAD104 | Amazon Web Services | Operational | 50 |
| AWS IAD105 | Amazon Web Services | Operational | 50 |
| Amazon IAD100 | Amazon Web Services | Operational | 50 |
| Amazon IAD101 | Amazon Web Services | Operational | 50 |
| Amazon IAD102 | Amazon Web Services | Operational | 50 |
| Amazon IAD11 | Amazon Web Services | Operational | 50 |
| Amazon IAD130 | Amazon Web Services | Operational | 50 |
| Amazon IAD131 | Amazon Web Services | Operational | 50 |
| Amazon IAD14 | Amazon Web Services | Operational | 50 |
| Amazon IAD52 | Amazon Web Services | Operational | 50 |
| Amazon IAD59 | Amazon Web Services | Operational | 50 |
| Amazon IAD7 | Amazon Web Services | Operational | 50 |
| Amazon IAD73 | Amazon Web Services | Operational | 50 |
| Amazon IAD74 | Amazon Web Services | Operational | 50 |
| COPT Data Center Bldg 2 | Amazon Web Services | Operational | 50 |
| COPT Innovation Park Data Center | Amazon Web Services | Operational | 50 |
| COPT VA-4 | COPT | Operational | 48 |
| Amazon Web Services | Amazon IAD85 | Operational | 5 |
| QTS Manassas DC1 | Quality Technology Services | Operational | 5 |
Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.
Browse every data center in Virginia.
Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.
Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.
Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).
Manassas, VA: 1,261 MW tracked, any status — live, cited, and queryable by API or MCP.
JSON: /api/v1/markets/manassas/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-16, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load