Aligned Hillsboro, OR is a data center operated by Aligned in Hillsboro, OR, US. Its reported power capacity falls in the 100–500 MW range and it is currently planned.
Source: DC Hub facilities registry · Added , not re-checked since · Basis: cited (what this means)
Aligned Hillsboro, OR is one of 104 facilities DC Hub’s Hillsboro brief counts on the WECC grid. The closest tracked facility is CoreWeave Hillsboro OR (Flexential), under 1 km away, and the nearest mapped substation is within 1 km. Read the Hillsboro market brief →
Published DC Hub data for this location.
DC Hub tracks 47 operating generating units totalling 494 MW within about 50 km of Hillsboro, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.
Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.
Nearest first, by distance from this site.
execute_plan with this page's question for one dated, cited answer.
You can also query get_facility slug="aligned-aligned-hillsboro-or-7c12f1fe".
Source: DC Hub (dchub.cloud), as of [the as_of date on the result]. Connect:
https://dchub.cloud/connect